Start with the envelope
From the outside, look at the cellular pattern and its translucent cushion panels. The building was designed as the National Aquatics Center. Those panels enclose the large indoor space and are part of the building’s appearance in both uses.
Find what changes above the pool
Beijing’s engineering report describes a removable support structure installed in the pool for conversion. An ice surface for curling needs a stable, accurately leveled base and its own refrigeration. The temporary build-up provides those conditions while allowing the space to return to aquatic use when the conversion is removed.
Match a visit to the use you want to see
Check the venue’s current program before planning an interior visit. Training, sport, exhibitions, and leisure uses can place visitors in different parts of the complex. A look at the exterior is possible on many ordinary walks in the Olympic area, and published plans show the change inside when the competition floor is closed.
Continue exploring
Sources and visitor information
Arup’s design account of the Water Cube · Beijing municipal engineering report on the pool-to-ice structure
Sources checked November 22, 2026.